The voice of the networks

How can this website be improved? Give us your feedback

Publications

Reset filters

869 result(s) found

2016

Angling Guidance Sheet

Category: Safety

Type: Guide or guidance

Guidance covering angling in close proximity to overhead power lines

View publication

2014

Angler Safety and Risk Assessment (30 m Angling Exclusion Zone)

Category: Safety

Type: Guide or guidance

Guidance to Angling risk assessment related to the default 30 metre Angling Exclusion Zone

View publication

2022

G99 Form D1

Category: Engineering

Type: Form

Form to detail confirmation of the decommissioning of a Power Generating Module connected in parallel with the public Distribution Network in accordance with Engineering Recommendation G99.

View publication

2022

G99 Form C3

Category: Engineering

Type: Form

Commissioning check form to be completed for every Power Generating Facility - appendices from Engineering Recommendation G99 (Connection of generation >3.68kW)

View publication

2022

G99 Form C2.2

Category: Engineering

Type: Form

G99 Form for Site Compliance and Commissioning test requirements for Type C and Type D Power Generating Modules to be completed if site compliance tests are being undertaken.

View publication

2022

G99 Form C2.1

Category: Engineering

Type: Form

Power Generating Module Document for Type C and Type D Power Generating Modules to be completed by the Generator - appendices from Engineering Recommendation G99.

View publication

2022

G99 Form B3

Category: Engineering

Type: Form

Installation and Commissioning Confirmation Form for Type B PGMs to be completed for every Power Generating Facility - appendices from Engineering Recommendation G99.

View publication

2022

G99 Form B2.2

Category: Engineering

Type: Form

G99 Form for Site Compliance and Commissioning test requirements for Type B Power Generating Modules to be completed if site compliance tests are being undertaken.

View publication

2022

G99 Form B2.1

Category: Engineering

Type: Form

Power Generating Module Document for Type B Power Generating Modules. Compliance statement to be completed by the Generator - appendices from Engineering Recommendation G99.

View publication

2022

G99 Form A3.2

Category: Engineering

Type: Form

Installation Document for Integrated Micro Generation and Storage - appendices from Engineering Recommendation G99 (Connection of generation >3.68kW)

View publication

2022

G99 Form A3.1

Category: Engineering

Type: Form

Installation Document for Type A Power Generating Modules (Form A3-1) and Integrated Micro Generation and Storage (Form A3-2) - appendices from Engineering Recommendation G99

View publication

2022

G99 Form A2.4

Category: Engineering

Type: Form

This G99 form should be completed if site compliance tests are being undertaken for some or all of the Interface Protection where it is not Type Tested and for other compliance tests.

View publication

2022

G99 Form A2.3

Category: Engineering

Type: Form

Compliance Verification Report for Type A Inverter Connected Power Generating Modules - appendices from Engineering Recommendation G99 (Connection of generation >3.68kW)

View publication

2022

G99 Form A2.2

Category: Engineering

Type: Form

G99 Compliance Verification Report for Synchronous and Asynchronous (non inverter) Power Generating Modules > 50 kW and also for Synchronous and Asynchronous (non inverter) Modules.

View publication

2022

G99 Form A2.1

Category: Engineering

Type: Form

Compliance Verification Report for Synchronous and Asynchronous (non inverter) Power Generating Modules up to and including 50 kW - appendices from Engineering Recommendation G99.

View publication

2022

G99 Form A1.2

Category: Engineering

Type: Form

Application for connection of Fully Type Tested Integrated Micro Generation and Storage installations - appendices from Engineering Recommendation G99 (Connection of generation >3.68kW)

View publication

2022

G99 Form A1.1

Category: Engineering

Type: Form

Application for connection of Power Generating Module(s) with Total Aggregate Capacity

View publication

2022

G98 Form D

Category: Engineering

Type: Form

G98 Micro-generator de-commissioning form and declaration to be completed by the Installer no later than 28 days after de-commissioning all, or some of the Micro-generators.

View publication

2022

G98 Form C

Category: Engineering

Type: Form

This form should be used when making a Type Test submission to Energy Networks Association (ENA) and is the Manufacturer’s declaration of compliance with the requirements of G98.

View publication

2022

G98 Form B

Category: Engineering

Type: Form

G98 Installation form for connection under Connection of generation

View publication

2002

G98 Form A

Category: Engineering

Type: Form

G98 Application for connection of multiple Micro-Generating installations Connection of generation

View publication

2018

Demand Side Response - Demand Units and Installation Proformas

Category: Engineering

Type: Form

Demand Side Response proformas (DSR1-3) for Demand Units and Installation with supporting definitions and explanatory notes

View publication

2019

Electric Vehicle Charge Points and Heat Pumps Multi-install Application Form

Category: Innovation

Type: Form

Form used to notify or apply to the network operator for multiple Low Carbon Technologies (Electric Vehicle Charge Points, including Vehicle-to-Grid, or Heat Pumps) installations

View publication

2019

Low Carbon Technologies Heat Pump Split System Database Form

Category: Innovation

Type: Form

Form used to submit Split-System Heat Pump equipment specifications to the main Heat Pump Database

View publication

2021

ON19-WS3 DSO Transition Future World Impact Assessment Consultation Responses

Category: Open Networks

Type: Consultation

Consultation responses to Workstream 3 Future Worlds (2019)

View publication

2021

ON19-WS3 DSO Transition Future World Impact Assessment Consultation - ONP Response

Category: Open Networks

Type: Consultation

Open Networks 2019 response to Workstream 3 Impact Assessment consultation

View publication

2021

ON19-WS3 DSO Transition Future World Impact Assessment - Consultation Detailed Analysis

Category: Open Networks

Type: Consultation

Workstream 3 Annex 1: Consultation Analysis Results

View publication

2021

ON19-WS3 Consultation DSO Transition Future Worlds Impact Assessment

Category: Open Networks

Type: Consultation

Consultation on Workstream 3 Future Worlds impact assessment

View publication

2018

ON18-WS3 ENA Future Worlds - options to facilitate energy decarbonisation, digitisation and decentralisation

Category: Open Networks

Type: Consultation

Workstream 3 Developing change options to facilitate energy decarbonisation, digitisation and decentralisation

View publication